The Hoover Dam Bypass
Project:
To transport construction materials and equipment needed for the new Hoover Dam Bypass, Timberland supplied high-speed traction hoists and hydraulic power units for the trolley system carrying loads along the two 50-ton cable cranes. Timberland provided the hoists for load lifting and the double-drum mast luffing hoists.
Challenge:
Timberland was called upon to deliver this custom-designed equipment in a very accelerated timeframe after the project’s original cranes were destroyed by heavy winds. The bypass construction was at a virtual standstill until Timberland delivered the system and ensured its proper operation.
Success:
Our quick delivery commitment was achieved, meeting the very specific cable crane requirements and application needs so project could go ahead on schedule.
For further information, contact:
Timberland Equipment Limited
Aaron VanMaanen
Business Development Manager
519-537-6262
Visit our projects gallery for more engineered material handling solutions from Timberland Equipment Limited.