Project:

Agnico Eagle, a Canadian-based gold producer, commissioned Timberland Equipment to manufacture a custom quadruple head sheave assembly to replace an existing unit at its Goldex mine in Val d’Or, Quebec.

Challenge:

The design of the new sheave assembly was required to improve on the performance and durability characteristics of the original assembly while matching all of the existing mounting requirements.

Success:

Timberland’s 3D modeling technology allowed our engineering group to design an assembly with higher capacity and extended longevity benefits in an assembly that fit into the pre-existing installation constraints. The design also provided for improved servicing with replaceable polyurethane liners and independent lubrication provisions for ease of maintenance.

For further information, contact:

Timberland Equipment Limited
Troy Smith
Product Coordinator
519-537-6262

Visit our projects gallery for more engineered material handling solutions from Timberland Equipment Limited.